Out With the Old, In With the New

Though our layout is essentially shut down each year over the summer months (from mid-May to the end of August), it is hardly a quiet time for the CP Sudbury Division. The summer season is when layout expansion work, heavy construction and miscellaneous major projects can occur without the interruption of club operating sessions or open houses to get in the way.  

The summer of 2024 was particularly busy with a number of major projects including; a complete change-out of the turnout ground throws for Tortoise switch machines within our Copper Cliff / Creosote industrial area, CTC signaling and logic programming at Stinson siding, fluorescent to LED valence lighting replacement over many aisles, and the construction of a maintenance platform within our ‘sky helix’ that spirals between floors connecting Sprecher and Larchwood.

The ‘sky helix’ spiralling between floors connecting Sprecher and Larchwood. Preparations to finish the mainline required a maintenance platform be built to climb into this helix from the main floor.

Possibly the most exciting project of the summer was a complete clean-out of all the stuff we’ve stored for many, many years now on the top floor. Well, the actual cleaning part sucked as it was tough and took what seemed forever, but it was done to clear the way for our Cartier Sub mainline to finally be completed. As August ended, we had already begun the benchwork for Sturgeon Falls, and planning for the huge 14-track staging yard (representing the entire CPR west of Cartier ON) that will be built above it. That is the exciting part.

Autumn and colder weather also marks the beginning of another operating season for the CP Sudbury Division layout, with five op sessions and two dates where we’re open for the public. A number of operational projects also occurred prior to the operating season beginning, mainly involving the addition and preparation of new equipment (weathering rolling stock, DCC programming of locomotives, etc.) along with any modifications or updates required by our car-forwarding/waybill system.

Two strings of our new Rapido NSC reefers form a backdrop behind recently retired stand-ins. The three reefers in the middle are the first Rapido models we weathered. Though they served faithfully for nearly two decades, these old stand-in ‘foobies’ were never accurate models.

In addition to the usual operational projects, this summer also saw us replace an entire fleet of cars, and even a piece of office furniture. Replacements of car fleets are not common, as the vast majority of our rolling stock are high-quality models which fairly accurately represent their prototypes. But some of our freight cars are ‘placeholders’ so to speak. These are cars too important or iconic to not have within our operations, and so we utilize inaccurate models or ‘foobies’ (to use modeller’s jargon) that appear close enough. If or when accurate replacements become available then these foobie fleets get replaced, and we have blogged about this topic in the past.

Duelling CP 286381’s. Only a minority of CP’s 400+ fleet of 50ft mechanical reefers were ever repainted into the CP Rail scheme, so it shouldn’t be surprising that a road number Rapido selected would conflict one of our old cars. Rapido’s accurate model (left) versus an old Athearn ‘blue-box’ repainted version (right).

The mass replacement which occurred this past summer was our CP mechanical refrigerated boxcar fleet. These reefers were staples on CP’s hot transcon freights through the 1970s, with large blocks appearing right on the head-end of freights like #952. Our operations wouldn’t be right without them. So with the exception of a single 40ft kitbashed model of a CP 285600-series car, our entire fleet of mechanical reefers were stand-ins consisting of Athearn ‘blue-box’ models, and some Accurail outside-braced 50’ boxcar bashes. These were all retired thanks to a club bulk purchase of brand new Rapido NSC-built CP reefers.

Side-by-side comparison of an old Athearn ‘blue-box’ reefer (left) with a new Rapido NSC model (right). Though the Athearn cars represented another prototype (the Hawker-Siddeley smooth-sided reefer) they were all retired thanks to the Rapido car being a 100% correct model of an NSC-built outside-braced reefer.

Replacing office fixtures is even more uncommon than rolling stock retirements, since there are so few that we utilize in club operations. In fact, we believe this to be the first instance. Our venerable and iconic Crew Call Board, a grid-marked whiteboard employed since our first operating sessions began well over 20 years ago, had to be replaced.

As the layout expanded and new freights continued to be added to our operations over the decades, we’d been stretching the old board past its original capacities. Three additional rows were squeezed in over time. We even saved room by listing both the Montreal and Toronto sections of “The Canadian” within one line. However, we broke the board after our first nickel ore train was inaugurated (INCO Job 2), and had no room left when the time came to add hotshot transcon freights 901/902 to our operating scheme.

Comparison of our old Crew Callboard (as photographed in 2021) with the new replacement board ready to go for our 14 September 2024 op session. After adding transcon freight 949 and INCO Job 2 to club operations a few months ago, we ran out of room for trains 901/902.

With our resent summer work beginning the push to finish our Cartier Sub mainline from North Bay to Cartier staging, it wasn’t hard to think of building towards the future. So, we acquired a very large whiteboard and grid-marked it with 40 rows. All those rows will allow us to list every mainline freight and local that was ever run on a daily basis over the CP Sudbury Division, with accommodation for a few extras and second sections too. Our only worry now is will we have enough operators to run them all? Thinking back to our lean beginnings during the WRMRC’s fledgling years, that is actually a remarkable thing to have to worry about.

January Operating Session: Saturday Jan 14, 2023

We hope that everyone enjoyed the holiday season, and that the new year brings you peace, joy and good health.

Speaking of the 2023, our first operating session of the year will be held this upcoming Saturday, January 14th 2023, from 12:00 until about 6:30PM.

3316_912Nairn

If you are interested in attending the operating session as a guest, please contact us via our Facebook page or send us e-mail so we know how many people to expect.

(Note: we will do our best to accommodate visiting operators, however this is dependent on session attendance numbers and available operating positions.)

For a full list of club events in 2023, please see our calendar page.

 

WRMRC Op-Session and Activity Update

Due to Ontario’s extension of emergency orders regarding COVID-19, the WRMRC has cancelled the annual Junk Night operating session which was scheduled for Saturday May 9th; 2020.

At this point the club is planning to start the 2020-21 operating season again in the fall, with the next scheduled op-session planned for Saturday 12 September, 2020. Please continue to monitor this blog along with the WRMRC’s Facebook page for future updates.

While layout progress may have been hampered by the public health crisis, our members have been busy working on many projects from home, or coordinating amongst themselves to limit numbers when visits to the club are required. Here are just a few club ventures while under quarantine.

Romford/Coniston signal project

RomfordPanel01

Romford Operator Panel

RomfordPanel02

Reverse side of the Romford Panel – for those who love wiring

RomfordSignals

Searchlight signals for Romford and Coniston

Wanapitei River Bridge

WanapiteiBridge

Wanapitei River bridge (in development)

Nelson Street Bridge

NelsonStBridge

Bridge abutments and scenery repairs (in progress)

Sudbury Ice House

Ice House

Ice House (in development)

Ice House

Ice House

The club is also preparing to work on scenery in a number of areas which will require trees. Many, many trees.

Conifer 01

Conifer 02

One silver lining to the cancellation of operating sessions is that preparations have begun to build the permanent trackage into Espanola, home of the large E. B. Eddy paper mill. Thanks to Fast Tracks, a number of code-70 turnouts have already been built towards this goal.

EspanolaTurnout

Code-70 right-hand turnout built with Fast Tracks jig.

While we certainly miss the comradery that comes with our group work sessions, we are fortunate to live in a time where we can connect digitally. All of us at the WRMRC wish you good health, and to keep up your spirits with good model railway projects.

 

WRMRC March Public Activities Cancelled

On the advice of medical officials, is with reluctance that the WRMRC executive has decided to cancel all club public activities over the month of March in order to help contain the spread of the COVID-19 virus. This includes the operating session scheduled for tomorrow, and our participation in the 2020 Doubleheaders Tour. The following is a letter from our president.


Dear WRMRC Membership,

As you know developments in the COVID 19 corona virus situation have been coming fast and furious. Since my email to the group earlier today changes in advice from public health professionals have led the officers of the club to take a hard look at our plans. I have also been receiving emails from members indicating that they will be restricting their activities in coming days. As a result the officers have decided by unanimous consent to cancel the March operating session which was scheduled for this Saturday and to cancel our participation in the DoubleHeaders Tour scheduled for Saturday, March 28. We will decide on the May operating session as we get closer to the date and see how the situation develops.

We have taken this action reluctantly. We all do love to “play with trains” and were looking forward to the session. We also enjoy sharing our hobby with others and regret missing the tour. Given the advice from public officials and concerns of our own membership, we believe that this is the more responsible option. Since the Wednesday work sessions involve smaller groups we have not cancelled those at the moment, but individual members should feel free to take a break from Wednesdays as they feel necessary. Continue to monitor this group (our groups.io page) for further news.

Everyone stay safe and, as best you are able, healthy.

Bob Kelly

WRMRC President

 

Junk Night – Nuit de Junque

This past Saturday, the WRMRC marked an annual tradition that dates back to times before the formal creation of the club. Our infamous ‘Junk Night’ operating session.

Junque_20180512_125202

Engineer R.Bosma carefully backs a cut of Toronto-bound cars into the interchange track at Romford ON. Locos for this Junk Night edition of the North Bay Turn are a CN GMD-1 / SD40-2W motive power duo.

It is much better described as a non ’70s CP session, where our usual Sudbury Division trains are powered by whatever locomotives our members wish to showcase. Railway, era, prototype or totally fictional; for one day none of that matters.

Many have asked us how we came up with the name. After all, none of the motive power is ‘junk.’ All are high-quality models.

Well, there is a bit of history to it.

Junque_20180512_161950

A fictional MR&T widecab GE Dash-8 leads two Conrail GP40s on a Junk Night edition of CP train 921 near Sprecher ON.

Like many model train clubs, the WRMRC was born from a private home layout. That owner (and founding president) had a large pike depicting the CP MacTier Subdivision, forged from his memories of cottage country in the 1960s. As the MacTier Sub motive power fleet was being improved, earlier locomotives purchased to get the layout up-and-running had been retired. These were mostly old ’70s-era models, mainly Athearn ‘blue box’ and Atlas ‘yellow box’ locos painted for various US railroads. So in the middle of a regular CP MacTier Sub operating session, he once quipped that we should hold a session where we break out all this “old junk power.” And from that our junk night sessions were born.

Junque_20180512_133840

WRMRC member S. Lyons brought out his lovingly rebuilt brass model of CN J-4-e #5126 (4-6-2 MLW-built ‘Pacific’) to fill the duties of the Sudbury east yard switcher. Models like this are what cause some to question our ‘Junk Night’ moniker. Now you know the full story.

It should also be noted these sessions had been held on Saturday evenings in the past. This explains the ‘night’ part in Junk Night, as we’ve switched to afternoon-held operating sessions for a number of years now. Finally, the traditional day for Junk Night was always the operating session that fell closest to April Fools Day. With the WRMRC eliminating April sessions in recent years, this now applies to our May operating date.

Junque_20180512_162403

No, this train did not take a wrong turn at St Thomas. Baltimore & Ohio power finds its way to Sudbury on this Junk Night operating session.

Junk Night has always been a big hit at the WRMRC. It often morphs into a show-and-tell session, with members often displaying their models in various stages of completion, sometimes even in different scales. So if you ever visit the layout for our May operating session, don’t be surprised if you spot an Erie Lackawanna SDP45 leading one of our trains. It’s not leased power, and it’s not a detour; it’s ‘Junk Night.’