Some uneveness near the back of the top turn of the helix entering into the scene at Romford necessitated replacing half of the turn with a new piece of plywood. Here the ties are back down for the main tracks on the new turn of the helix. This replacement is required for passenger cars to operate reliably through this area, and by winter the Canadian should be arriving, and both the Montreal and Toronto portions will be operating through here.