Copper Cliff – 2006

Copper Cliff – 2006

The styrofoam scenery base has started to be installed around the spline roadbed. All trackage is handlaid on spline roadbed created from strips of 1/4″ pine. The scenery is made from layers of styrofoam, shaped with a hot wire cutter and rasps. Drywall mud or plaster will be used to do the final surfacing

Leave a Reply

Your email address will not be published. Required fields are marked *