Entry Gate – 2009 Published January 6, 2016 at 720 × 540 in Construction Photos 2000-2009 Entry Gate – 2009 Cutting the spline for the lift-up entry. To ensure perfect alignment, the roadbed was built as continuous spline across the bridge opening, and then cut to allow the bridge to open.