Erecting the new stud wall and the beginning of the new intermediate level walkway. Between this wall and the existing wall will be a new walkway, elevated about 4 feet off the concrete base. Stairs to the new level will be to the left of the short wall. The Creighton Mine scene will be on the facing side of this wall.