The first turn of the helix that will eventually join Wanipitei (lower level on opposite side of the wall studs at left) to Stinson (upper level) is down, and the first pieces of new track have been laid! Scenery in the background barely visible between the studs is the east end of Sudbury yard. Clarabelle (on the Nickel Subdivision) and Flanagan (end of double track west of Sudbury) will be built on the right side. See map levels 1 and 2 on our track diagram for reference.