Trackwork realignment at Romford, looking towards the future junction and wye, with Coniston in the far background. The temporary junction switch and part of the turn below have been removed. Part of the reconstruction involves realigning the top turn of the helix to stay below the new visible tracks, as there are embankments and small ponds to either side of the track. Some heavy repairs the the backdrop have also been completed through this area in preparation for building the junction trackwork and scenery in this location.