Sprecher/Creighton – 2007

Sprecher/Creighton – 2007

This area is the part of the layout that will feature the Nickel Subdivision to Clarabelle (lower level, left and rear) and Creighton Mine (upper level, right). The Cartier subdivision mainline leaving Sudbury westbound is on the upper deck, with the Inco ore interchange at Sprecher at top left and the end of double track at Flanagan at the rear on the upper deck.

This view shows the area in Spring 2007 at the beginning of the construction project in this area. Construction will involve benchwork for all levels of track, several long hidden ramps and a helix connecting the various levels as well as well as walls and stairs to upper levels.

Leave a Reply

Your email address will not be published. Required fields are marked *