Phelans

Phelans

Note how the main track changes from the right to left side of the roadbed at this point. Before CTC was installed on the Cartier subdivision in 1968-69, the entire portion from Sudbury to Carter was double track. At Phelans there was a large gravel pit, which is off to the left in this photo.

Leave a Reply

Your email address will not be published. Required fields are marked *