Sprecher/Creighton – 2007

Sprecher/Creighton – 2007

The flooring for the new walkway is in, as are the steps up from the floor. This intermediate level walkway services layout levels 3 and 4, and is about 4′ above the concrete base of the ground level. To the right of the stairs on the facing wall, two levels will represent the Nickel subdivision towards Creighton Mine, which will be located here on the upper level.

Leave a Reply

Your email address will not be published. Required fields are marked *